Danish study slams nuclear power: it's too expensive

Energy Study: Nuclear Cost Hits €100/MWh, Wind-Solar Mix at €46. The 53% Gap Emerges with New SLCOE Indicator

Danish study slams nuclear power: it's too expensive

Henrik Lund and ten colleagues from the universities of Aalborg, LUT, Manchester and Zagreb have published on Energy A paper that touches a very sensitive nerve: the cost of nuclear power, calculated using the standard method, systematically underestimates the cost of integrating it into the system. They proposed a new indicator and applied it to Denmark, projected to 2050. Result? The offshore wind plus solar mix costs €46/MWh, while nuclear costs €100. A 53% difference. And the hypotheses used, say the authors, are still generous towards nuclear power.

Change the meter, change the number

The LCOE, the "Levelized Cost of Energy," is the standard used for decades to compare nuclear power plants, wind farms, and photovoltaic systems. It measures the cost of producing a megawatt-hour "out of the power plant": investment, maintenance, fuel, and useful life. A clean, portable number, perfect for ministerial committee slides. The problem is that it ignores one tiny detail: the system into which that energy must be fed.

Lund and Christian Breyer (co-author, professor at LUT University in Finland) have developed a second indicator, theSLCOE (system-based LCOE), which adds integration costs: grid balancing, storage, power reserves, line expansion, sector coupling. This last term makes all the difference: it means connecting electricity generation to heating, transportation, hydrogen, and industry. In an integrated system, the wind power that blows at night isn't wasted; it heats homes or charges cars.

When you compare the classic LCOE with the new SLCOE, in a climate-neutral system by 2050, the picture changes: nuclear reaches €100/MWh, the offshore-solar mix 46. Onshore wind does not enter the winning mix, because in Denmark the offshore conditions are too favorable. Fraunhofer in Germany had arrived at compatible numbers, but with a different method. Lund formalizes the matter: the ruler we were using was incomplete.

nuclear cost nuclear costs

The trick explained easily

Imagine buying a car. You look at the price list: Model A costs less than Model B. You sign. Then you discover that Model A requires a private road to drive, a full-time mechanic in the garage, and insurance that covers damage only if it rains exactly every Tuesday. Model B, on the other hand, integrates with existing traffic, shares spare parts with half the cars on the road, and has a mechanic right on your doorstep. This is more or less what happens when you compare the cost of nuclear power with that of solar and wind power using the old LCOE indicator, the Levelized Cost of Energy. A convenient number, used by bankers and politicians, that tells you how much it costs to produce a megawatt-hour "out of the power plant." What it doesn't tell you is how much it costs to get it into the system without blowing everything up.

The financial detail that makes the accounts explode

Here is the real heart of the paper. TheIEA, in his World Energy Outlook 2023 and 2024, estimates the overnight cost of European nuclear power by 2050 around €4.500/kW. It seems reasonable. But to get to the final number, the IEA applies an 8% discount rate to nuclear power, while renewables applies one between 3 and 5%. Reason: Nuclear is considered a "high project risk" investment, while wind is not. The discount differential compensates for construction uncertainty. It's standard practice.

Lund translates this into a comparable figure: applying 8% to the IEA's €4.500/kW yields the same annual burden as applying 5% to €10.000/kW. For WEO 2024, the equivalent figure is €11.200/kW. The ruler is getting longer, and the cost of nuclear power is double the official figure. Not because someone cheated: because the 8% discount, applied to a capital that is reviewed after twelve years of construction, is valid as such. figures aligned with real costs of the Hinkley Point C power plants in the UK, Olkiluoto in Finland, Flamanville in France, where final costs exceeded initial estimates by 100%.

The cost of nuclear power: what the paper didn't consider (and what would further worsen the picture)

The authors are explicit: their 53% is a conservative estimate. They excluded three uncomfortable voices. permanent storage of high-level waste, which in Europe is estimated at 422-566 billion euros. The opportunity cost of the ten to fifteen years of construction during which renewables are not installed. And the social and health costs, which however (it must be said) remain outside of most energy models.

A side note on solar: the IEA estimates utility-scale PV at €480/kW in 2050. Breyer notes that todayIn 2026, real prices are already around €400/kW. The modeled benefit underestimates the real one. Oh well.

Study Card

  • Title: SLCOE – system-based LCOE for comparing energy technologies in different systems
  • Main authors: Henrik Lund (Aalborg University), Christian Breyer (LUT University) and 9 other researchers
  • Publication: Energy, vol. 353, 140880, April 2026 (Elsevier, open access CC-BY)
  • DOI: 10.1016/j.energy.2026.140880
  • Case studyDenmark by 2050, simulated with EnergyPLAN software, across all sectors (electricity, heating, transport, industry)
  • Key result: SLCOE nuclear €100/MWh, SLCOE offshore wind + solar mix €46/MWh (-53%)
nuclear cost

Italy has not yet decided "with which ruler" to measure the cost of nuclear power

The Italian echo of these numbers is particular. The government has announced a Roadmap for the return to nuclear power with SMR and AMR, with the aim of reaching 8 GW installed capacity by 2050 and covering 11% of electricity needs. The estimated cost of nuclear power from Italian SMRs is around €107/MWh. Cingolani, CEO of Leonardo, talks about Advanced third-generation water-based SMRs no earlier than 2030 e Generation IV Advanced Modular Reactors from 2040 onwards. Pichetto, the Minister of the Environment, is more optimistic and envisions the first operational modules starting in 2035.

Lund's numbers applied to that plan say something uncomfortable. Even assuming that the Italian SMRs enter into operation in 2035 at the expected cost (and already on this point, the international precedents are all negative), remain more expensive than an integrated system based on renewables and demand flexibility. Not to mention that globally solar installations are proceeding at a speed that nuclear has never reached: China added in 2025 300 GW of solar in one yearWhat are we doing?

The wrong ruler doesn't make the wall wrong. It makes the room wrong.

When will we really see it?

Estimated horizon: 5-10 years for SLCOE to become the standard measurement in national energy plans; 15-20 years for real effects on investment decisions to be seen.

The problem isn't the paper's mathematics, it's that energy indicators have enormous institutional inertia: the IEA will continue to publish LCOEs for years, because its audience (banks, governments, funds) is accustomed to that ruler. The SLCOE will first enter academic models, then perhaps the plans of TSOs like Energinet, and finally public decision-making processes. Those who will benefit first: Northern European countries with already flexible systems. Italy, which has just chosen to focus on nuclear power, has a different timeframe: public debate comes after decisions have already been made.

cost of nuclear power
How does GPT 2's AI see it? A "photo" of the Danish coast: offshore wind farm in the foreground, a power plant on the horizon that probably won't be built.

For all the lawyers, interns, and Atom students out there: the paper doesn't say "nuclear is bad." It says something more technical: if you only measure production costs, you're measuring a room by looking at the floor. When you include the system, rents change, and significantly. Calculating the cost of nuclear power in this way remains a viable option, but it's rarely the cheapest option. Especially in a future where electric cars, heat pumps, and electrolyzers will require the grid to be fluid, not rigid. Lund says it with the dry tone of Danish engineers: the way we've compared energy technologies for forty years needs to be updated. This isn't a slogan; no one is waging war here, and we don't want any fights. Provide your data calmly and clearly, if there are any.

One thing is good to know, however: this is a legitimate methodological correction, but the effect, if the correction passes, is political. Few words to the wise.

Gianluca Riccio

Gianluca Riccio, creative director of Melancia adv, copywriter and journalist. He is part of the Italian Institute for the Future, World Future Society and H+. Since 2006 he has directed Futuroprossimo.it, the Italian Futurology resource. He is a partner of Forwardto-Studies and skills for future scenarios. Follow him on LinkedIn